Detailed Description: |
Quantity: 5 sets
Specs:ISO14001,ISO9001
Payment Method: T/T,L/C
Product introduction XF rubber slowly-closing cut-off valve is a new water supply and drainage valve with full rubber structure, duck-mouthed appearance and functions of positive flow-in and reserve cut-off. According to thrust analysis and calculation as well as different operation conditions, it is manufactured with different design mechanism and different rubber products by special processing, At positive operation the water flow inform entrance and the valve will be open at weak hydraulic pressure. The hydraulic pressure is higher. The valve gate will open more greatly and the water flow is greater, At reserve operation, the valve gate closes naturally and seals tightly cut-off valve, the back pressure is higher, the valve gate closes more tightly and the seal effect is better. It is used widely in various drainage exits to prevent from pouring backwards and flowing backwards in city planning, water conservancy and sewage disposal etc, it is the ideal product to replace flap valve.
Product characteristics: The advantages are specially marked in comparison with traditional flap valve: A) Open and close automatically in security and reliability according to hydraulic difference without noise and in no need of operator and maintenance. B) Positive start has little water resistance and start-up pressure and the flow can be adjusted naturally according to hydraulic pressure. C) Reserve cut-off has good seal without leakage to prevent from flowing backwards. The back pressure is higher and the effect is barrier. D) Anticorrosion, aging resistance, deformation resistance, strong adaptability and long use life E) Wide size scope, nominal diameter of DN50-DN3000.
Application scope: 1) Excellent performance and wide application scope 2) Applicable for sewage system 3) Applicable for discharge system 4) Applicable for dyke discharge 5) Applicable for the drainage of airport and freeway 6) Applicable for sewer discharge 7) Applicable for sewage lagoon discharge 8) Smell separation
Installation structure type 1) Belled XF-T be installed at the exit of drainage pipe 2) Flanged XF-T be installed at the exit end with flange of drainage pipe 3) Mounting plate XF-F is installed on the building at the water exit end. 4) Build-in XF-F is installed at the exit end of rain and sewage system in cities. 5) Grout or cement pipe XF-T be installed at the end of grout or cement pipe. Delivery time: Within 30 days after receipt of the deposit, or as your request
Packaging details: Unfumigation wooden case (out package) and plastic film and textile membrane(inside package). We can make change as your request. |