Linear Vibrating Screen
Inquiry
Post Date: | Jun 27,2014 |
Expiry Date: | Dec 24,2014 |
Detailed Description: |
Use and repair
1, the machine should be installed in the electrical protection device. In early 2, the machine running the anchor bolts, check at least once a day, to prevent loosening. 3, when the motor rotation direction does not meet the requirements, adjust the power phase sequence. 4, the machine stops again after a longer period of time when using, should measure the insulation resistance, for 500 volt megger, should be greater than 500000000000 in europe. 5, the machine is running a total of 1500 hours, you should check the bearings, if serious injury should be replaced immediately. 6, the motor should be to ensure good lubrication, each running two weeks supplementation of lithium based grease (ZL-3) once, petrol, oil cup to add the amount of lithium base grease. When using sealed bearings, motor without installation. |
Company: | Hua County BigDipper Electrostatic Separation Facility Factory [ China ] |
Contact: | Li Jiantang |
Tel: | 13213287684 |
Fax: | +86-0372-8118690 |
Email: | jsflsb@163.com |
-
Disclaimer statement:The information and data included above have been realized by the enterprises and compiled by the staff, and are subject to change without notice to you. The Chemnet makes no warranties or representations whatsoever regarding the facticity, accuracy and validity of such information and data. In order to ensure your interest, we suggest you chose the products posted by our gold suppliers or VIP members.