Home > Offer to Sell > Pharmaceuticals and Biochemicals > Hormones and synthetic substitutes > Raw chemicals Senior Matt wall or paint Great Quality

Raw chemicals Senior Matt wall or paint Great Quality

Inquiry
  Post Date: Jan 18,2017
  Expiry Date: Jul 17,2017
  Detailed Description: Quantity: 1Metric Tons
Price:1 USD Kilograms
Payment Method: Wertern Union, Money Gram, T/T , Bitcoin
Basic Info:
Name:Senior Matt wall or paint
Apearance:White liquid
CAS:NA
MF:
MW:
Shipment:EMS,DHL,UPS,Fedx
Package:disguised
Payment: Bank Transfer,Bitcoin,WU,MoneyGram
Product introduction
Senior matte wall weather is acrylate emulsion as basic material, with water as dispersion medium, add fillers and additives of fine processed into an economic and environmentally friendly emulsioni paint.The paint construction is convenient, fast drying, non-toxic, non-combustible, good adhesion, covering rate and alkali corrosion resistance performance,
use
Suitable for all kinds of high-rise buildings and general residential exterior wall decoration.
Quality indicators
State in the container no lumps, after mixing homogeneously state
The drying time, not less than 2 h
Contrast ratio (white and light color) not less than 0.9
Alkali resistance (48 h) without exception
Water resistance (96 h) without exception
Scrubbing resistance, greater than (5000)
The freezing and thawing resistance is not bad
Paint consumption ㎡ / kg 8 ~ 10
Brushing besmear to brush 2 barrier-free
Construction of the reference
Dilution: can be diluted with water, mineral water should be controlled in 5 ~ 15% to construction viscosity;
Basic level processing: metope grassroots should remove floating dust and pollutants, no cracks, a new wall curing period normally should be more than two weeks (need) it is advisable to more than 20 days in winter, the old metope should be polished smooth, eliminate the pollutants, such as metope cracked and concave uneven, alkali resistance and corrosion resistance of exterior wall putty to fill available flat construction (don't use chemical paste mixing putty).Should stir well before painting, need the seal of our company before painting the wall primer coating, coating paint again after 2 ~ 4 h.
Matters needing attention
Winter construction temperature should be not less than 5 ℃, the temperature should be above 10 ℃, relative humidity below 85%, after the completion of construction tools should be cleaned with water in time, the remaining paint should cover seal, the product should be stored in a cool and dry place, protected from frost, should not be below 0 ℃ storage.
Welcome inquiry and trying, here is Amy serving.If more details,just emails pls.


  Company: Yuancheng Hezhong     [ China ]        
  Contact: Amy
  Tel: 86-731-22290202
  Fax:
  Email: hnzz01@ycgmp.com
Disclaimer statement:The information and data included above have been realized by the enterprises and compiled by the staff, and are subject to change without notice to you. The Chemnet makes no warranties or representations whatsoever regarding the facticity, accuracy and validity of such information and data. In order to ensure your interest, we suggest you chose the products posted by our gold suppliers or VIP members.